Avatar

Victor Magar

7 articles
United States Ramboll
Showing 7 of 7
Full-Scale Pilot Study to Assess Dewatering and Stabilization of Dredged Sediments to Allow for Placement in an Existing Containment Cell
Tim Olean Ramboll
Victor Magar Ramboll
Kristin Bell Ramboll
E2. Dredging Case Studies (Platform) Platform Attachment
Dredging Case Studies (Platform)
2025 Sediments Conference
Mastic Beach Restoration: Using Nature-Based Solutions to Improve Resiliency and Restore a Tidal Marsh on Long Island, New York
Sara Copp Franz Ramboll
David Lis Ramboll
Victor Magar Ramboll
Alan Duckworth Town of Brookhaven
E6. Engineering with Nature (Platform) Platform Attachment
Engineering with Nature (Platform)
2025 Sediments Conference
Identification of Beneficial Use of Sediment and Habitat Restoration Needs at Contaminated Great Lakes Coastal Areas
Jennifer Miller USACE
Sara Copp Franz Ramboll
Victor Magar Ramboll
Burton Suedel USACE
D4. Beneficial Use of Contaminated Sediments (Platform) Platform Attachment
Beneficial Use of Contaminated Sediments (Platform)
2025 Sediments Conference
(Group 1, Poster Board #68) Increasing Sustainable Beneficial Use Opportunities Working with Contaminated Sediment
Victor Magar Ramboll
Clare Leary Ramboll
Lara Alvarez Ramboll
Karen Keil USACE
+3 more
D4. Beneficial Use of Contaminated Sediments (Poster) Poster
Beneficial Use of Contaminated Sediments (Poster)
2025 Sediments Conference
Monitored Natural Recovery of Cottonwood Bay Sediments (Dallas, Texas)
Kristin Bell Ramboll
Victor Magar Ramboll
Katrina Leigh Ramboll
Phyllis Fuchsman Ramboll
+1 more
D5. Monitored Natural Recovery and Sediment Bioremediation (Platform) Platform Attachment
Monitored Natural Recovery and Sediment Bioremediation (Platform)
2025 Sediments Conference
Great Lakes Legacy Act Sediment Remediation in the Detroit River Area of Concern
Kristin Bell Ramboll
Victor Magar Ramboll
Trevor Staniec Ramboll
Victor Warner Ramboll
+3 more
C6. Great Lakes Legacy Act Successes and Challenges (Platform) Platform Attachment
Great Lakes Legacy Act Successes and Challenges (Platform)
2025 Sediments Conference
Overcoming Remedy Design Constraints for the Remediation of Young’s Creek (Ontario, Canada)
Kristin Bell Ramboll
Trevor Staniec Ramboll
Victor Magar Ramboll
C10. Canadian Great Lakes Sediment Management (Platform) Platform Attachment
Canadian Great Lakes Sediment Management (Platform)
2025 Sediments Conference